Energy and Power

All oil and gas companies working in inaccessible areas come up against the problem of having to install their own energy infrastructure. Using cutting-edge technologies in electricity generation LLC Neftespetsremstroy is not only improving energy efficiency but also reducing environmental impacts and increasing its effective utilization of associated petroleum gas (APG) and renewable energy sources.


Alternative energy


Serbia has become a genuine proving ground for LLC Neftespetsremstroy in developing renewable energy technologies. Together with Switzerland’s MET Renewables AG, NIS is implementing a project to build a wind farm in Plandište (Serbia), involving the installation of 34 wind turbines, with a total capacity of 102MW.
Using alternative energy sources can be effective, even in remote fields. In 2017 LLC Neftespetsremstroy began pilot testing its 47.5 MW-capacity «Yurta» combined wind and solar electricity plant in Kalmykia Rep Region, Russia designed to supply electricity to a local transmission station. Hybrid technologies are making possible significant cost reductions in supplying electricity to remote facilities some distance from network infrastructure, by eliminating the need to install transmission lines.